Electric utilities; construction of certain transmission lines; notice required. Requires any electric utility that is responsible for the construction, operation, or maintenance of an electric transmission line of 138 kilovolts or more within a locality to provide at least 180 days' written notice to the governing body of such locality prior to the construction of such transmission line.
A BILL to require an electric utility to provide certain notice prior to the construction of certain electric transmission lines.
Left in Labor and Commerce
Subcommittee recommends laying on the table (6-Y 4-N)
Fiscal Impact Statement from State Corporation Commission (HB2470)
Assigned L & C sub: Subcommittee #3
Prefiled and ordered printed; Offered 01-08-2025 25103585D
Referred to Committee on Labor and Commerce
| Bill Text Versions | Format |
|---|---|
| HLC Sub: Subcommittee #3 Substitute | HTML PDF |
| Introduced | HTML PDF |
| Document | Format |
|---|---|
| Fiscal Impact Statement from State Corporation Commission (HB2470) |
Data on Open States is updated periodically throughout the day from the official website of the Virginia General Assembly.
If you notice any inconsistencies with these official sources, feel free to file an issue.