Net energy metering; solar interconnection;cost recovery. Provides that an electric distribution companyshall pay $1 per kilowatt per day for the costs of lost electricityproduction for any and all delays beyond the regulatory notice periodrequired by State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering,an eligible customer-generator shall bear all reasonable costs ofequipment required at the eligible customer-generator's side of the meter forthe interconnection to the supplier's electric distribution system,including reasonable and prudent costs of additional controls, tests,or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution gridtransformation projects that support the interconnection of generatingfacilities using energy derived from sunlight that are owned or contractedby eligible customer-generators, subject to the Commission findingthose costs to be reasonable and prudent in accordance with existinglaw.
Senate committee, floor amendments and substitutes offered
Continued to 2025 in Commerce and Labor (14-Y 1-N)
Senate committee, floor amendments and substitutes offered
Senate committee, floor amendments and substitutes offered
Impact statement from SCC (SB346)
Senate committee, floor amendments and substitutes offered
Prefiled and ordered printed; offered 01/10/24 24104922D
Referred to Committee on Commerce and Labor
Bill Text Versions | Format |
---|---|
Prefiled and ordered printed; offered 01/10/24 24104922D | PDF HTML |
Document | Format |
---|---|
Fiscal Impact Statement: SB346F171.PDF |
Data on Open States is updated periodically throughout the day from the official website of the Virginia General Assembly.
If you notice any inconsistencies with these official sources, feel free to file an issue.