HB 1563

  • Indiana House Bill
  • 2025 Regular Session
  • Introduced in House
  • House
  • Senate
  • Governor

Alternative and nuclear energy generation.

Abstract

Requires: (1) a public utility to notify the Indiana utility regulatory commission (commission) of the public utility's intention to retire an electric generation facility not later than 18 months before the planned retirement date; and (2) the commission to conduct a study to determine the feasibility of using the location and infrastructure of the electric generation facility for development of alternative energy generation projects, including consideration of the suitability of the location and infrastructure for use in developing a nuclear energy facility.

Bill Sponsors (2)

Votes


No votes to display

Actions


Jan 21, 2025

House

Coauthored by Representative DeVon

House

Authored by Representative Smith H

House

First reading: referred to Committee on Utilities, Energy and Telecommunications

  • Reading-1
  • Referral-Committee
Utilities, Energy and Telecommunications

Bill Text

Bill Text Versions Format
Introduced House Bill (H) PDF

Related Documents

Document Format
Fiscal Note: HB1563.01.INTR.FN001 PDF

Sources

Data on Open States is updated periodically throughout the day from the official website of the Indiana General Assembly.

If you notice any inconsistencies with these official sources, feel free to file an issue.