Carolyn Jackson
- Democratic
- Representative
- District 1
Provides that with respect to the construction of a Class 2 structure for which a building permit is issued after December 31, 2023, the structure must be designed, constructed, and wired so as to enable an occupant of the structure to charge an electric vehicle (EV) through the use of EV supply equipment supplied by the occupant or a third party. Specifies that this requirement does not require a person who designs, constructs, or wires a Class 2 structure to: (1) provide EV supply equipment for use on the premises; or (2) install, or inspect EV supply equipment that is installed, on the premises.
No votes to display
Representative Harris added as coauthor
Authored by Representative Jackson
First reading: referred to Committee on Roads and Transportation
Bill Text Versions | Format |
---|---|
Introduced House Bill (H) |
Document | Format |
---|---|
Fiscal Note: HB1135.01.INTR.FN001 |
Data on Open States is updated periodically throughout the day from the official website of the Indiana General Assembly.
If you notice any inconsistencies with these official sources, feel free to file an issue.