SB 25-127

  • Colorado Senate Bill
  • 2025 Regular Session
  • Introduced in Senate Feb 05, 2025
  • Senate
  • House
  • Governor

Optimizing Colorado Electric Transmission System

Abstract

Current law requires the Colorado electric transmission authority (authority) to conduct a study on the need for expanded transmission capacity in the state and prepare a final report of the study on or before January 31, 2025. Section 2 of the bill authorizes the authority to conduct the study on a recurring basis and requires the authority to present a statewide transmission plan, based on the results of the study, to the Colorado public utilities commission (commission) and the legislature every 3 years, beginning on or before September 1, 2027. Section 2 requires the authority to consider advanced transmission technologies in the study and identify certain projects that use advanced transmission technologies. "Advanced transmission technologies" is defined in section 1 as hardware or software technologies that increase the capacity, efficiency, reliability, or resiliency of an existing or new transmission facility. Section 3 designates the authority as a statewide transmission coordinator. Among other duties, the authority is required to facilitate coordinated statewide planning; engage with regional and interregional planning processes; and establish an expert advisory panel to review and provide feedback on model inputs, assumptions, and approaches. Under current law, an electric utility must submit an electric resource plan to the commission for approval. Sections 4 and 5 require an electric utility to: Include in the electric resource plan a transmission plan that identifies certain transmission resources and projects; Incorporate in the electric resource plan an evaluation of advanced transmission technologies or submit to the commission an explanation of why advanced transmission technologies are not included in the electric resource plan; and Provide model inputs and assumptions and other system information or methodology consultation necessary to support the authority in acting as a statewide transmission coordinator. Section 4 allows the commission to design incentives for a retail electric utility that utilizes advanced transmission technologies. Section 6 requires an electric utility to consider advanced transmission technologies in the electric utility's 10-year transmission plan.(Note: This summary applies to this bill as introduced.)

Bill Sponsors (2)

Votes


No votes to display

Actions


Apr 17, 2025

Senate

Senate Second Reading Laid Over to 05/08/2025 - No Amendments

Apr 11, 2025

Senate

Senate Second Reading Laid Over to 04/17/2025 - No Amendments

Apr 09, 2025

Senate

Senate Second Reading Laid Over to 04/11/2025 - No Amendments

Apr 07, 2025

Senate

Senate Second Reading Laid Over to 04/09/2025 - No Amendments

Apr 04, 2025

Senate

Senate Second Reading Laid Over to 04/07/2025 - No Amendments

Mar 31, 2025

Senate

Senate Second Reading Laid Over to 04/04/2025 - No Amendments

Mar 26, 2025

Senate

Senate Committee on Transportation & Energy Refer Amended to Senate Committee of the Whole

  • Committee-Passage
  • Referral-Committee
Senate Committee of the Whole Transportation & Energy

Feb 05, 2025

Senate

Introduced In Senate - Assigned to Transportation & Energy

  • Introduction
Transportation & Energy

Bill Text

Bill Text Versions Format
Introduced (02/05/2025) PDF
PA1 (03/27/2025) PDF
Committee Amendment PDF

Related Documents

Document Format
Fiscal Note FN1 (03/07/2025) PDF
Fiscal Note FN2 (03/28/2025) PDF
Fiscal Note FN3 (07/17/2025) PDF

Sources

Data on Open States is updated periodically throughout the day from the official website of the Colorado General Assembly.

If you notice any inconsistencies with these official sources, feel free to file an issue.