HB 25-1260

  • Colorado House Bill
  • 2025 Regular Session
  • Introduced in House Apr 15, 2025
  • Passed House Apr 14, 2025
  • Senate
  • Governor

Electrical Generation & Distribution Resiliency

Abstract

The bill requires the public utilities commission (commission) to evaluate electrical generation and grid resilience against geomagnetic storms (evaluation) and report the findings of the evaluation to the general assembly. The bill requires each electrical utility that is subject to the jurisdiction of the North American Electric Reliability Corporation to annually submit a critical energy infrastructure information request to the federal energy regulatory commission. If the utility receives the permission, each of these electrical utilities must annually brief the general assembly on the utility's contingency action plan and any information necessary to: Evaluate the ability of and identify shortfalls to restoring electrical power operation, fuel delivery, and equipment function within specified time frames following certain types of geomagnetic storms; and Evaluate the certification of hardware and software monitoring and controlling systems for energy generation and distribution. The bill sets standards for the evaluation. Based on the evaluation, the commission shall adopt rules requiring an electrical utility to meet resiliency standards for geomagnetic storms. The rules include: Requiring the monitoring of the space weather prediction center of the national oceanic and atmospheric administration in order to isolate large power transformers and power generation from the grid; Mechanically isolating critical components if or when a coronal mass ejection is likely to cause geomagnetically induced currents; Restricting or closing fuel pipeline valves to mitigate damage in a sectional failure; Installing automatic neutral ground blocking devices in large power transformers; Ensuring that computer equipment can be mechanically isolated from the grid and sheltered from geomagnetically induced surges; Requiring all networked systems that operate electrical generation and distribution to be electronically and physically separable from the outside networks; and Requiring the cyber-certification of hardware and software that operate electrical generation and distribution. (Note: Italicized words indicate new material added to the original summary; dashes through words indicate deletions from the original summary.) (Note: This summary applies to the reengrossed version of this bill as introduced in the second house.)

Bill Sponsors (18)

Votes


Apr 14, 2025

Actions


Apr 23, 2025

Senate

Senate Committee on Transportation & Energy Postpone Indefinitely

Transportation & Energy

Apr 15, 2025

Senate

Introduced In Senate - Assigned to Transportation & Energy

  • Introduction
Transportation & Energy

Apr 14, 2025

House

House Third Reading Passed - No Amendments

Apr 11, 2025

House

House Second Reading Special Order - Passed with Amendments - Committee, Floor

Apr 06, 2025

House

House Second Reading Laid Over Daily - No Amendments

Apr 04, 2025

House

House Second Reading Laid Over to 04/06/2025 - No Amendments

Mar 31, 2025

House

House Committee on Finance Refer Amended to House Committee of the Whole

  • Committee-Passage
  • Referral-Committee
House Committee of the Whole Finance

Mar 05, 2025

House

House Committee on Energy & Environment Refer Amended to Finance

  • Referral-Committee
Finance

Feb 13, 2025

House

Introduced In House - Assigned to Energy & Environment

  • Introduction
Energy & Environment

Bill Text

Bill Text Versions Format
Reengrossed (04/14/2025) PDF
Engrossed (04/11/2025) PDF
Introduced (02/13/2025) PDF
PA2 (04/03/2025) PDF
PA1 (03/06/2025) PDF
Committee Amendment PDF

Related Documents

Document Format
Fiscal Note FN1 (03/03/2025) PDF
Fiscal Note FN2 (03/13/2025) PDF
Fiscal Note FN3 (04/01/2025) PDF
Fiscal Note FN4 (06/12/2025) PDF

Sources

Data on Open States is updated periodically throughout the day from the official website of the Colorado General Assembly.

If you notice any inconsistencies with these official sources, feel free to file an issue.