Steve Padilla
- Democratic
- Senator
- District 18
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. This bill would authorize the commission to assess the extent to which electrical corporation costs associated with new loads from data centers result in cost shifts to other electrical corporation customers, as provided. The bill would require the commission to submit an assessment completed pursuant to that authorization to the relevant policy committees of the Legislature and to publicly post a copy of the assessment on the commission's internet website on or before January 1, 2027.
Chaptered by Secretary of State. Chapter 647, Statutes of 2025.
Approved by the Governor.
Enrolled and presented to the Governor at 2 p.m.
Assembly amendments concurred in. (Ayes 29. Noes 8. Page 3022.) Ordered to engrossing and enrolling.
Read third time. Passed. (Ayes 57. Noes 18. Page 3358.) Ordered to the Senate.
In Senate. Concurrence in Assembly amendments pending.
Read second time. Ordered to third reading.
Read second time and amended. Ordered to second reading.
From committee: Do pass as amended. (Ayes 10. Noes 4.) (August 29).
August 20 set for first hearing. Placed on APPR. suspense file.
Read second time and amended. Re-referred to Com. on APPR.
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 4.) (July 9).
From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E.
June 25 hearing postponed by committee.
Read third time. Passed. (Ayes 25. Noes 9. Page 1308.) Ordered to the Assembly.
In Assembly. Read first time. Held at Desk.
Read second time. Ordered to third reading.
From committee: Do pass. (Ayes 5. Noes 0. Page 1189.) (May 23).
Set for hearing May 23.
April 28 hearing: Placed on APPR. suspense file.
Set for hearing April 28.
Read second time and amended. Re-referred to Com. on APPR.
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 12. Noes 3. Page 681.) (April 7).
From committee with author's amendments. Read second time and amended. Re-referred to Com. on E., U & C.
Set for hearing April 7.
From committee with author's amendments. Read second time and amended. Re-referred to Com. on E., U & C.
From printer. May be acted upon on or after February 8.
Introduced. Read first time. To Com. on RLS. for assignment. To print.
| Bill Text Versions | Format |
|---|---|
| SB57 | HTML |
| 01/08/25 - Introduced | |
| 03/05/25 - Amended Senate | |
| 03/26/25 - Amended Senate | |
| 04/10/25 - Amended Senate | |
| 06/30/25 - Amended Assembly | |
| 07/14/25 - Amended Assembly | |
| 09/02/25 - Amended Assembly | |
| 09/18/25 - Enrolled | |
| 10/11/25 - Chaptered |
| Document | Format |
|---|---|
| 04/04/25- Senate Energy, Utilities and Communications | |
| 04/25/25- Senate Appropriations | |
| 05/25/25- Sen. Floor Analyses | |
| 07/08/25- Assembly Committee on Utilities and Energy | |
| 08/18/25- Assembly Appropriations | |
| 09/03/25- ASSEMBLY FLOOR ANALYSIS | |
| 09/12/25- Sen. Floor Analyses |
Data on Open States is updated periodically throughout the day from the official website of the California State Legislature.
If you notice any inconsistencies with these official sources, feel free to file an issue.