AB 2341

  • California Assembly Bill
  • 2011-2012 Regular Session
  • Introduced in Assembly Feb 24, 2012
  • Assembly
  • Senate
  • Governor

: Distribution grid: distributed generation.

Abstract

Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to administer, until January 1, 2016, a self-generation incentive program for distributed generation resources to facilitate the integration of those resources into the electrical grid, improve efficiency and reliability of the distribution and transmission system, and reduce emissions of greenhouse gases, peak demand, and ratepayer costs. This bill would require the PUC to ensure, through its decisions in electrical corporation general rate cases and related proceedings, that all investments in the distribution grid are compatible with optimal deployment of distributed generation, to the extent grid upgrades are required to meet a goal of 12,000 megawatts of distributed generation by 2020.

Bill Sponsors (2)

Votes


Actions


Apr 23, 2012

Assembly

In committee: Set, first hearing. Failed passage.

Mar 19, 2012

Assembly

Referred to Com. on U. & C.

  • Referral-Committee
Com. on U. & C.

Feb 27, 2012

Assembly

Read first time.

Feb 26, 2012

Assembly

From printer. May be heard in committee March 27.

Feb 24, 2012

Assembly

Introduced. To print.

Bill Text

Bill Text Versions Format
AB2341 HTML
02/24/12 - Introduced PDF

Related Documents

Document Format
No related documents.

Sources

Data on Open States is updated periodically throughout the day from the official website of the California State Legislature.