Distribution grid: distributed generation.

Abstract

Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to administer, until January 1, 2016, a self-generation incentive program for distributed generation resources to facilitate the integration of those resources into the electrical grid, improve efficiency and reliability of the distribution and transmission system, and reduce emissions of greenhouse gases, peak demand, and ratepayer costs. This bill would require the PUC to convene a proceeding on or before July 1, 2013, to develop rules, as prescribed, for the reimbursement of distribution grid upgrade costs to developers of wholesale distribution generation facilities constructed subsequent to the completion of interconnection studies. The bill would require those costs to be included in each electrical corporation's rate base.

Bill Sponsors (2)

Votes


Actions


Apr 23, 2012

Assembly

In committee: Set, first hearing. Failed passage.

Mar 19, 2012

Assembly

Referred to Com. on U. & C.

  • Referral-Committee
Com. on U. & C.

Feb 27, 2012

Assembly

Read first time.

Feb 26, 2012

Assembly

From printer. May be heard in committee March 27.

Feb 24, 2012

Assembly

Introduced. To print.

Bill Text

Bill Text Versions Format
AB2340 HTML
02/24/12 - Introduced PDF

Related Documents

Document Format
No related documents.

Sources

Data on Open States is updated periodically throughout the day from the official website of the California State Legislature.

If you notice any inconsistencies with these official sources, feel free to file an issue.