SB 14

  • California Senate Bill
  • 2009-2010 Regular Session
  • Introduced in Senate Dec 01, 2008
  • Passed Senate Mar 31, 2009
  • Passed Assembly Sep 12, 2009
  • Governor

Utilities: renewable energy resources.

Abstract

(1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to require the state's 3 largest electrical corporations, Pacific Gas and Electric Company, San Diego Gas and Electric, and Southern California Edison, to identify a separate electrical rate component to fund programs that enhance system reliability and provide in-state benefits. This rate component is a nonbypassable element of local distribution and collected on the basis of usage. Existing PUC resolutions refer to the nonbypassable rate component as a "public goods charge." The public goods charge moneys are collected to support cost-effective energy efficiency and conservation activities, public interest research and development not adequately provided by competitive and regulated markets, and renewable energy resources. The existing Warren-Alquist State Energy Resources Conservation and Development Act establishes the State Energy Resources Conservation and Development Commission (Energy Commission) . Existing law establishes the Renewable Resource Trust Fund as a fund that is continuously appropriated, with certain exceptions for administrative expenses, in the State Treasury and requires that certain moneys collected to support renewable energy resources through the public goods charge are deposited into the fund and authorizes the Energy Commission to expend the moneys pursuant to the Renewable Energy Resources Program. The program states the intent of the Legislature to increase the amount of electricity generated from eligible renewable energy resources per year so that amount equals at least 20% of total retail sales of electricity in California per year by December 31, 2010. This bill would revise the Renewable Energy Resources Program to state the intent of the Legislature to increase the amount of electricity generated from eligible renewable energy resources per year, so that amount equals at least 33% of total retail sales of electricity in California per year by December 31, 2020. The bill would revise certain terms used in the program and revise certain eligibility criteria for a renewable electrical generation facility, as defined, pursuant to the program. The bill would require the Energy Commission, by May 31, 2010, to report to the Legislature whether out-of-state, run-of-river hydroelectric generating facilities should be considered renewable electric generating facilities, as defined. (2) Existing law expresses the intent of the Legislature, in establishing the California Renewables Portfolio Standard Program (RPS program) , to increase the amount of electricity generated per year from eligible renewable energy resources, as defined, to an amount that equals at least 20% of the total electricity sold to retail customers in California per year by December 31, 2010. This bill would express the intent that the amount of electricity generated per year from eligible renewable energy resources be increased to an amount that equals at least 20% of the total electricity sold to retail customers in California per year by December 31, 2013, and 33% by December 31, 2020. (3) The Public Utilities Act imposes various duties and responsibilities on the PUC with respect to the purchase of electricity and requires the PUC to review and adopt a procurement plan and a renewable energy procurement plan for each electrical corporation, as defined, pursuant to the RPS program. The RPS program requires that a retail seller of electricity, including electrical corporations, community choice aggregators, and electric service providers, but not including local publicly owned electric utilities, purchase a specified minimum percentage of electricity generated by eligible renewable energy resources in any given year as a specified percentage of total kilowatthours sold to retail end-use customers each calendar year. The RPS program requires the PUC to implement annual procurement targets for each retail seller to increase its total procurement of electricity generated by eligible renewable energy resources by at least an additional 1% of retail sales per year so that 20% of its retail sales of electricity are procured from eligible renewable energy resources no later than December 31, 2010. Existing law requires the PUC to make a determination of the existing market cost for electricity, which PUC decisions call the market price referent, and to limit an electrical corporation's obligation to procure electricity from eligible renewable energy resources, that exceeds the market price referent, to an amount collected through the renewable energy public goods charge. This bill would instead require the PUC to require that a retail seller procure the following percentages of electricity from eligible renewable energy resources by the following dates: (A) Until December 31, 2012, the same percentage as actually achieved by the retail seller during 2009; (B) 20% by December 31, 2013; (C) 25% by December 31, 2016; and (D) 33% by December 31, 2020. The bill would authorize the PUC to permit a retail seller to delay compliance with (B) or (C) procurement levels when specified circumstances are present, but would not authorize the PUC to permit a retail seller to delay compliance with the (D) procurement level. The bill would delete the existing market price referent provisions and instead require the PUC to establish a methodology to determine the market price of electricity for terms corresponding to the length of contracts with eligible renewable energy resources, in consideration of, and reflecting, certain matters. The bill would require the PUC to establish a limitation on the annual expenditures made above the market price, by an electrical corporation, in order to achieve the procurement levels established by the PUC. The bill would require the PUC to permit an electrical corporation to limit its procurement of electricity from eligible renewable energy resources to that quantity that can be procured at or below the market prices established by the PUC, up to the limitation. The bill would delete an existing requirement that the PUC adopt flexible rules for compliance for retail sellers. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by expanding the definition of a crime. (4) Under existing law, the governing board of a local publicly owned electric utility is responsible for implementing and enforcing a renewables portfolio standard for the utility that recognizes the intent of the Legislature to encourage renewable resources, while taking into consideration the effect of the standard on rates, reliability, and financial resources and the goal of environmental improvement. This bill would repeal this provision and instead make certain of the requirements of the RPS program, as discussed below, applicable to local publicly owned electric utilities. By placing additional requirements upon local publicly owned electric utilities, the bill would impose a state-mandated local program. (5) Existing law requires the Energy Commission to certify eligible renewable energy resources, to design and implement an accounting system to verify compliance with the RPS requirements by retail sellers, and to develop tracking, accounting, verification, and enforcement mechanisms for renewable energy credits, as defined. This bill would require the Energy Commission to design and implement an accounting system to verify compliance with the RPS requirements by retail sellers and local publicly owned electric utilities. The bill would require the Energy Commission, among other things, to adopt regulations specifying procedures for enforcement of the RPS requirements that include a public process under which the Energy Commission is authorized to issue a notice of violation and correction with respect to a local publicly owned electric utility and for referral to the State Air Resources Board for penalties imposed pursuant to the California Global Warming Solutions Act of 2006. The bill would require that the RPS established for a local publicly owned electric utility require it to procure the following percentages of electricity from eligible renewable energy resources by the following dates: (A) Until December 31, 2012, the same percentage as actually achieved by the utility during 2009; (B) 20% by December 31, 2013; (C) 25% by December 31, 2016; and (D) 33% by December 31, 2020. The bill would provide that the local publicly owned electric utility retains discretion with respect to certain matters in complying with the RPS, would require that certain notices be given by the utility when adopting and periodically revising its procurement plan, and would require the utility to report certain information relative to RPS compliance to the Energy Commission and its customers. (6) Existing law requires the PUC to prepare and submit to the Governor and the Legislature a written report annually before February 1 of each year on the costs of programs and activities conducted by an electrical corporation or gas corporation that have more than a specified number of customers in California. The bill would require the PUC to prepare and submit to the policy and fiscal committees of the Legislature, annually before February 1 of each year, a report on (A) all electrical corporation revenue requirement increases associated with meeting the renewables portfolio standard, (B) all cost savings experienced, or costs avoided, by electrical corporations as a result of meeting the renewables portfolio standard, (C) all costs incurred by electrical corporations for incentives for distributed and renewable generation, (D) all cost savings experienced, or costs avoided, by electrical corporations as a result of incentives for distributed generation and renewable generation, (E) specified costs for which an electrical corporation is seeking recovery in rates that are pending determination or approval by the PUC, (F) the decision number of each PUC decision in the prior year authorizing an electrical corporation to recover costs incurred in rates, and (G) any changes in the prior year in load serviced by an electrical corporation. (7) This bill would appropriate $322,000 from the Public Utilities Commission Utilities Reimbursement Account to the PUC for additional staffing to identify, review, and approve transmission lines reasonably necessary or appropriate to facilitate achievement of the renewables portfolio standard. (8) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.

Bill Sponsors (13)

Votes


Actions


Jan 19, 2010

Senate

Stricken from Senate file.

Oct 11, 2009

Senate

In Senate. To unfinished business. (Veto)

Senate

Vetoed by Governor.

Oct 08, 2009

California State Legislature

Enrolled. To Governor at 1:45 p.m.

Sep 12, 2009

Assembly

Read third time. Passed. (Ayes 49. Noes 28. Page 3393.) To Senate.

Senate

Senate concurs in Assembly amendments. (Ayes 22. Noes 13. Page 2440.) To enrollment.

Senate

In Senate.

Sep 11, 2009

Assembly

Read second time. To third reading.

Sep 10, 2009

Assembly

From committee: Do pass as amended. (Ayes 10. Noes 5.)

Assembly

Read second time. Amended. To second reading.

Assembly

(Heard in committee on September 9.)

Sep 09, 2009

Assembly

Joint Rule 62(a) file notice suspended. (Page 3152.)

Sep 04, 2009

Assembly

Re-referred to Com. On U. & C. pursuant to Assembly Rule 77.2.

  • Referral-Committee
Com. On U. & C. pursuant to Assembly Rule 77.2.

Assembly

Read third time. Amended. (Ayes 43. Noes 28. Page 3041.)

Aug 31, 2009

Assembly

From committee: Do pass. (Ayes 12. Noes 5.)

Assembly

Read second time. To third reading.

Assembly

(Received by Desk on August 28 pursuant to Joint Rule 61(a)(11).)

Assembly

(Heard in committee on August 27.)

Aug 19, 2009

Assembly

Set, first hearing. Referred to APPR. suspense file.

  • Referral-Committee
APPR. suspense file. APPR

Aug 18, 2009

Assembly

From committee with author's amendments. Read second time. Amended. Re-referred to Com. on APPR.

  • Reading-1
  • Referral-Committee
  • Reading-2
  • Committee-Passage
Com. on APPR.

Jul 14, 2009

Assembly

Read second time. Amended. Re-referred to Com. on APPR.

  • Referral-Committee
  • Reading-2
  • Reading-1
Com. on APPR.

Jul 13, 2009

Assembly

(Heard in committee on July 8.)

Assembly

From committee: Do pass as amended, but first amend, and re-refer to Com. on APPR. (Ayes 5. Noes 3.)

Jul 06, 2009

Assembly

(Heard in committee on July 6.)

Assembly

From committee: Do pass, but first be re-referred to Com. on NAT. RES. (Ayes 10. Noes 5.) Re-referred to Com. on NAT. RES.

  • Referral-Committee
  • Committee-Passage-Favorable
  • Committee-Passage
Com. on NAT. RES. (Ayes 10. Noes 5.) Re-referred to Com. on NAT. RES.

Jul 01, 2009

Assembly

Joint Rule 62(a) file notice (Com. on U. & C.) suspended. (Ayes 46. Noes 25. Page 2335.)

Jun 30, 2009

Assembly

Set, first hearing. Further hearing to be set.

Jun 23, 2009

Assembly

From committee with author's amendments. Read second time. Amended. Re-referred to Com. on U. & C.

  • Reading-1
  • Referral-Committee
  • Reading-2
  • Committee-Passage
Com. on U. & C.

May 11, 2009

Assembly

To Coms. on U. & C. and NAT. RES.

Mar 31, 2009

Assembly

In Assembly. Read first time. Held at Desk.

Senate

Read third time. Passed. (Ayes 21. Noes 16. Page 374.) To Assembly.

Mar 24, 2009

Senate

Read second time. Amended. To third reading.

Mar 23, 2009

Senate

From committee: Do pass as amended. (Ayes 7. Noes 5. Page 332.)

Mar 16, 2009

Senate

Set for hearing March 23.

Senate

Placed on APPR suspense file.

Mar 12, 2009

Senate

Re-referred to Com. on APPR.

  • Referral-Committee
Com. on APPR.

Senate

From committee with author's amendments. Read second time. Amended. Re-referred to Com. on APPR.

  • Reading-1
  • Referral-Committee
  • Reading-2
  • Committee-Passage
Com. on APPR.

Senate

Set for hearing March 16.

Mar 03, 2009

Senate

From committee: Do pass, but first be re-referred to Com. on RLS. (Ayes 6. Noes 3. Page 250.) Re-referred to Com. on RLS.

  • Referral-Committee
  • Committee-Passage-Favorable
  • Committee-Passage
Com. on RLS. (Ayes 6. Noes 3. Page 250.) Re-referred to Com. on RLS.

Feb 23, 2009

Senate

Hearing postponed by committee.

Senate

Set for hearing March 3.

Feb 17, 2009

Senate

From committee with author's amendments. Read second time. Amended. Re-referred to Com. on E., U. & C.

  • Reading-1
  • Referral-Committee
  • Reading-2
  • Committee-Passage
Com. on E., U. & C.

Feb 14, 2009

Senate

Set for hearing February 23.

Feb 10, 2009

Senate

Testimony taken. Hearing postponed by committee.

Feb 05, 2009

Senate

Set for hearing February 10.

Feb 03, 2009

Senate

Set, first hearing. Hearing canceled at the request of author.

Jan 29, 2009

Senate

From committee with author's amendments. Read second time. Amended. Re-referred to Com. on E., U. & C.

  • Reading-1
  • Referral-Committee
  • Reading-2
  • Committee-Passage
Com. on E., U. & C.

Senate

Set for hearing February 3.

Senate

To Coms. on E., U. & C. and RLS.

Dec 02, 2008

Senate

From print. May be acted upon on or after January 1.

Dec 01, 2008

Senate

Introduced. Read first time. To Com. on RLS. for assignment. To print.

Bill Text

Bill Text Versions Format
SB14 HTML
12/01/08 - Introduced PDF
01/29/09 - Amended Senate PDF
02/17/09 - Amended Senate PDF
03/12/09 - Amended Senate PDF
03/24/09 - Amended Senate PDF
06/23/09 - Amended Assembly PDF
07/14/09 - Amended Assembly PDF
08/18/09 - Amended Assembly PDF
09/04/09 - Amended Assembly PDF
09/10/09 - Amended Assembly PDF
09/15/09 - Enrolled PDF

Related Documents

Document Format
No related documents.

Sources

Data on Open States is updated periodically throughout the day from the official website of the California State Legislature.

If you notice any inconsistencies with these official sources, feel free to file an issue.